Bamfield Community School
Bamfield Community School is receiving new HVAC upgrades this summer. We
will be working with PML Mechanical who are the mechanical contractors. Kerr
Controls will be performing the building automation system portion of the
work.
Richmond Elementary School
Client: School District 38 (Richmond)
Project Partners:
General Contractor: PML Professional Mechanical Ltd.
Product: Reliable Controls
Scope: DDC Controls for Boiler and UV Upgrade
Completed: Fall 2019 (September 2019)
PITT RIVER SCHOOL
Project Type: DDC System Recommissioning
Product: Reliable Controls
Scope:
Kerr Controls carried out a recommissioning study of the DDC system to identify current system deficiencies.
Software problems were troubleshot during this process. This involves manually manipulating the values of the system to find any failures in programming, installation, or hardware created by the original implementation of these systems.
Client: SD43 (Coquitlam)
Completed: Oct 2020
Colquitz Middle School
Client: SD61 (Greater Victoria School District)
Project Type: DDC Retrofit
Product: Reliable Controls
Completed: Fall 2018
TILLICUM ELEMENTARY
Product: Reliable Controls
Client: SD61 (Greater Victoria School District)
Project Type: DDC Retrofit
Product: Reliable Controls
Date Completed: Fall 2020
(Substantially complete in September 2020.)
CRYSTAL POOL DESIGN-BUILD
Kerr Controls was proud to be a part of the design-build team (led by Playsted Sheet Metal) for the Victoria Crystal Pool HVAC System Upgrade project.
Project Partners:
- Playsted Sheet Metal – mechanical equipment
- Rocky Point Engineering – engineering services
- Kerr Controls – Controls
Our Role:
In 2021 Kerr Controls implemented a Reliable Controls web-enabled building automation system for this building. This ensures that the facility operates with optimum energy efficiency while ensuring comfort for all occupants.
Product: Reliable Controls
PEXSISEN ELEMENTARY
Client:
School District 62 (Sooke)
Project Type:
New Construction
Project Overview:
This project is a building automation system installation for a new building. The land site at 3100 Constellation Avenue in West Langford is being prepared for two new schools.
Product:
Reliable Controls
JIM CICCONE CIVIC CENTER
Project Overview:
In September of 2020, Kerr Controls had the opportunity to participate in the Boiler Replacement Project at the Jim Ciccone Civic Centre in the City of Prince Rupert. This project involved replacing aging boilers with more energy-efficient condensing boilers and pumps.
Kerr Controls Inc. completed the Controls portion of the work. We installed a Reliable Controls building automation system to monitor and control the pool boilers, heating, and domestic hot water boilers, and all associated pumps, heat exchangers, valves, and equipment.
The new system has a user-friendly graphic interface and web-server capabilities.
Building Background:
Originally opened as the Prince Rupert Civic Centre on October 16, 1971, the Jim Ciccone Civic Centre has offered a place for the community to live and play actively since its inception. With the Civic Centre’s rededication to Jim Ciccone and his family on February the 9th, 1996, it continues its tradition of steadfast dedication to Prince Rupert and all of its visitors by supplying quality facilities for community activities. Facilities include the Russell Gamble Gymnasium, activity rooms, an auditorium, and an ice arena, aquatic centre.
Partners:
- Cura Projects (Colin Evans)
- City of Prince Rupert
- Slopeside Mechanical Systems
CENTRE MOUNTAIN LELLUM MIDDLE SCHOOL
Client:
School District 62
Project Overview:
The land site at 3100 Constellation Avenue in West Langford is being prepared for two new schools.
Product:
Reliable Controls