CRYSTAL POOL DESIGN-BUILD

Kerr Controls was proud to be a part of the design-build team (led by Playsted Sheet Metal) for the Victoria Crystal Pool HVAC System Upgrade project.

Project Partners:

  • Playsted Sheet Metal  – mechanical equipment
  • Rocky Point Engineering – engineering services
  • Kerr Controls – Controls

Our Role:

In 2021 Kerr Controls implemented a Reliable Controls web-enabled building automation system for this building. This ensures that the facility operates with optimum energy efficiency while ensuring comfort for all occupants.

Product: Reliable Controls

 

LET'S WORK TOGETHER

AND MAKE THE NEXT BEST PROJECT

CONTACT INFO

VICTORIA

5-6782 Veyaness Road
Saanichton, BC. V8M 2C2

250-655-0145

VANCOUVER

4388 Still Creek Dr #220,
Burnaby, BC. V5C 6C6

604-499-0973
TOP